No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | HATIGA ENGINEERING | 74.115.964.4-647.000 | Rp. 124.389.532,58 | Rp. 124.389.532,58 | Rp. 123.727.000,00 |
No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | HATIGA ENGINEERING | 74.115.964.4-647.000 | Rp. 124.389.532,58 | Rp. 124.389.532,58 | Rp. 123.727.000,00 |